During all this section, we evaluated the performance of the control architecture managing a real switch. However, the current implementation only manages a simulated switch. What should be done in order to transform it so that it could control a real switch?
As can be seen in figure
, the two objects which actually have a direct link to the switch are the switch interface and the traffic control module.